Single Post

Synchronizing panel will operate on an automatic mains failure system, so that when the main supply is interrupted on one or all phases (after an adjustable delay period) the generator sets will start-up together

After an initial warm-up period (adjustable) the generators will synchronize with each other by means of motorized circuit breakers or contactors onto a common busbar. Next, the motorized change-over switch will be closed and the load will be connected to the main distribution box.

The load share units continuously monitor the load and during low demand periods one or two generators will be shut down to save on fuel consumption. As demand rises again the second generator and third generator will be restarted, synchronized and reconnected to the load. When the AMF control unit detects that the main supply has been restored an adjustable observation period is activated before the main supply is reconnected. A cool down period will then follow, after which the generator sets will be shut down.

Key features of General Control & Synchronization Panel

  • 3-pole or 4-pole system as required
  • Various combinations of load transfer by ACBs, MCCBs or Contactors
  • Protection class up to IP 54
  • Load sharing/load shedding
  • Automatic and manual synchronizing
  • Factory built to client’s specifications
  • Ratings up to 6000A
  • Control functions available for engine monitoring, warm-up and cool down periods, emergency shutdown, multi attempt engine start control, engine test runs

Share this post

Comments (2)

  • editor March 19, 2020 Reply

    Lorem ipsum dolor sit amet, consectetur adipiscing elit. Nam viverra euismod odio, gravida pellentesque urna varius vitae, gravida pellentesque urna varius vitae.

    • editor March 19, 2020 Reply

      Lorem ipsum dolor sit amet, consectetur adipiscing elit.

Leave a Reply to editor Cancel reply

Your email address will not be published. Required fields are marked *